Ordinarily, the shop pays an once-a-year fee to UL to maintain the listing. Any time a UL inspector comes, he / she will be expecting to see the associated SCCR label utilized along side the UL508A label. Note: The SCCR label is additionally required, even though the shop is non-UL-accepted.The Similac litigation continues to be in its early stages